Be A Freedom Fighter · Bill Library
HR 5254 — Gateway Partnership Act
Freedom score: +1 (scale −10 to +10)
- Individual rights: 0
- Property rights: +1
- Economic freedom: +1
- Privacy & due process: -1
- Government power: 0
Sponsor: Rep. Bell, Wesley [D-MO-1] · Latest action: Star Print ordered on the reported bill, by unanimous consent. (2026-11-10)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 24 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty See in text ↓
- Sec. 3(c)(1)–(3) · Individual Rights — Events must be consistent with park purposes, compatible with National Park Service programs, not degrade park integrity/appearance/purposes, and not prevent or disrupt public use/access to the park or its buildings. Affected: Foundation, park visitors, NPS. Enforced through agreement terms and agency oversight; no new criminal sanction See in text ↓
- Sec. 3(e), Sec. 3(g) · Individual Rights — Preserves NPS event hosting and Secretary's authority to issue permits or enter other agreements. No direct general speech, religion, or assembly entitlement created See in text ↓
- Sec. 3(a) · Property Rights — Secretary “may” enter a one-time agreement with the named Foundation for private events in the park, including park buildings, for no more than five years. Affected: Foundation, Secretary, visitors and other potential organizers. Permissive, not compulsory; no property-title transfer or condemnation See in text ↓
- Sec. 3(b)(1) · Property Rights — Agreement must specify dates and times when Foundation may be the exclusive organization hosting special events in designated buildings. Affected: Foundation and other potential event organizers. Contractual/administrative enforcement; no standalone criminal penalty See in text ↓
- Sec. 3(b)(2)(A)–(B) · Property Rights — Agreement must limit number of events per month and provide appropriate NPS staffing for safety and resource protection. No new statutory fine See in text ↓
- Sec. 3(c)(1)–(3) · Property Rights — Resource compatibility, protection, and public-access constraints apply to events; no new criminal sanction See in text ↓
- Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created See in text ↓
- Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty See in text ↓
- Sec. 3(b)(3) · Economic Freedom — Agreement must require liability insurance sufficient to protect United States and name United States as additional insured. Affected: Foundation and insurers; contract condition, not tax or criminal fine See in text ↓
- Sec. 3(b)(5)–(6) · Economic Freedom — Secretary may modify or cancel agreement terms subject to mandatory conditions and include other terms deemed appropriate. Affected: Foundation, federal managers; contractual enforcement See in text ↓
- Sec. 3(d)(1) · Economic Freedom — Secretary “shall charge” fee covering maintenance attributable to wear and tear from events. Affected: Foundation; fee obligation; no criminal penalty See in text ↓
- Sec. 3(d)(2) · Economic Freedom — Secretary “may recover” all costs associated with Foundation event use, “notwithstanding any other provision of law,” including maintenance, utilities, administration, security, and personnel. Affected: Foundation and federal fisc; cost recovery, no new tax or criminal sanction See in text ↓
- Sec. 3(e), Sec. 3(g) · Economic Freedom — Savings clauses preserve other NPS events, permits, and agreements; no general monopoly over all park events established See in text ↓
- Sec. 3(b)(4) · Privacy and Due Process — Agreement must state that the United States and its agents and employees are not liable for claims, damages, or suits involving injury or death resulting from Foundation occupancy and use of park buildings. Affected: Foundation, federal government, potentially injured parties. Legal effect on nonparties and existing tort remedies is uncertain; no new surveillance or data collection See in text ↓
- Sec. 3(c)(3) · Privacy and Due Process — Protects visitor access during events; no independent new hearing or appeal procedure See in text ↓
- Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty See in text ↓
- Sec. 3(a) · Government Power — Grants Secretary discretion to enter one specified private-event agreement for at most five years; does not mandate execution See in text ↓
- Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction See in text ↓
- Sec. 3(c)(1)–(3) · Government Power — Mandatory compatibility, resource-protection, and visitor-access safeguards See in text ↓
- Sec. 3(d)(1)–(2) · Government Power — Mandatory wear-and-tear fee and discretionary broad cost recovery, including notwithstanding-other-law clause See in text ↓
- Sec. 3(e), Sec. 3(g) · Government Power — Preserves Secretary/NPS preexisting special-event and permit authority See in text ↓
- Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms See in text ↓
- Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty See in text ↓
Full text (introduced version)
22 of 24 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
SEC. 2. DEFINITIONS.
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
Sec. 2(1)–(4) · Individual Rights — Defines the Foundation (Gateway Arch Park Foundation), Park (Gateway Arch National Park), covered park buildings (Arch Visitor Center, Old Courthouse, and other publicly accessible buildings managed by Secretary), and Secretary (Interior). Definitions determine scope; no standalone penalty
SEC. 3. GATEWAY ARCH NATIONAL PARK AGREEMENT.
Sec. 3(a) · Property Rights — Secretary “may” enter a one-time agreement with the named Foundation for private events in the park, including park buildings, for no more than five years. Affected: Foundation, Secretary, visitors and other potential organizers. Permissive, not compulsory; no property-title transfer or condemnation
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(a) · Government Power — Grants Secretary discretion to enter one specified private-event agreement for at most five years; does not mandate execution
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(b)(1) · Property Rights — Agreement must specify dates and times when Foundation may be the exclusive organization hosting special events in designated buildings. Affected: Foundation and other potential event organizers. Contractual/administrative enforcement; no standalone criminal penalty
Sec. 3(b)(2)(A)–(B) · Property Rights — Agreement must limit number of events per month and provide appropriate NPS staffing for safety and resource protection. No new statutory fine
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(b)(3) · Economic Freedom — Agreement must require liability insurance sufficient to protect United States and name United States as additional insured. Affected: Foundation and insurers; contract condition, not tax or criminal fine
Sec. 3(b)(5)–(6) · Economic Freedom — Secretary may modify or cancel agreement terms subject to mandatory conditions and include other terms deemed appropriate. Affected: Foundation, federal managers; contractual enforcement
Sec. 3(b)(4) · Privacy and Due Process — Agreement must state that the United States and its agents and employees are not liable for claims, damages, or suits involving injury or death resulting from Foundation occupancy and use of park buildings. Affected: Foundation, federal government, potentially injured parties. Legal effect on nonparties and existing tort remedies is uncertain; no new surveillance or data collection
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(b)(1) · Property Rights — Agreement must specify dates and times when Foundation may be the exclusive organization hosting special events in designated buildings. Affected: Foundation and other potential event organizers. Contractual/administrative enforcement; no standalone criminal penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(b)(3) · Economic Freedom — Agreement must require liability insurance sufficient to protect United States and name United States as additional insured. Affected: Foundation and insurers; contract condition, not tax or criminal fine
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(b)(4) · Privacy and Due Process — Agreement must state that the United States and its agents and employees are not liable for claims, damages, or suits involving injury or death resulting from Foundation occupancy and use of park buildings. Affected: Foundation, federal government, potentially injured parties. Legal effect on nonparties and existing tort remedies is uncertain; no new surveillance or data collection
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(a), Sec. 3(b) · Economic Freedom — (1). Enables a named nonprofit to host private events at specified federal facilities, with potential exclusivity during defined periods. Limits opportunity to one identified organization under this particular statutory authorization. No independent criminal penalty
Sec. 3(b)(5)–(6) · Economic Freedom — Secretary may modify or cancel agreement terms subject to mandatory conditions and include other terms deemed appropriate. Affected: Foundation, federal managers; contractual enforcement
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(b)(1)–(6) · Government Power — Mandatory agreement conditions: exclusive-use dates/times, monthly event cap, staffing, insurance, liability allocation, modification/cancellation authority, and other appropriate conditions. Contractual enforcement; no new federal enforcement agency or criminal sanction
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(c)(1)–(3) · Individual Rights — Events must be consistent with park purposes, compatible with National Park Service programs, not degrade park integrity/appearance/purposes, and not prevent or disrupt public use/access to the park or its buildings. Affected: Foundation, park visitors, NPS. Enforced through agreement terms and agency oversight; no new criminal sanction
Sec. 3(c)(1)–(3) · Property Rights — Resource compatibility, protection, and public-access constraints apply to events; no new criminal sanction
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(c)(3) · Privacy and Due Process — Protects visitor access during events; no independent new hearing or appeal procedure
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(c)(1)–(3) · Government Power — Mandatory compatibility, resource-protection, and visitor-access safeguards
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(c)(1)–(3) · Individual Rights — Events must be consistent with park purposes, compatible with National Park Service programs, not degrade park integrity/appearance/purposes, and not prevent or disrupt public use/access to the park or its buildings. Affected: Foundation, park visitors, NPS. Enforced through agreement terms and agency oversight; no new criminal sanction
Sec. 3(c)(1)–(3) · Property Rights — Resource compatibility, protection, and public-access constraints apply to events; no new criminal sanction
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(c)(1)–(3) · Government Power — Mandatory compatibility, resource-protection, and visitor-access safeguards
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(c)(1)–(3) · Individual Rights — Events must be consistent with park purposes, compatible with National Park Service programs, not degrade park integrity/appearance/purposes, and not prevent or disrupt public use/access to the park or its buildings. Affected: Foundation, park visitors, NPS. Enforced through agreement terms and agency oversight; no new criminal sanction
Sec. 3(c)(1)–(3) · Property Rights — Resource compatibility, protection, and public-access constraints apply to events; no new criminal sanction
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(c)(1)–(3) · Government Power — Mandatory compatibility, resource-protection, and visitor-access safeguards
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(c)(1)–(3) · Individual Rights — Events must be consistent with park purposes, compatible with National Park Service programs, not degrade park integrity/appearance/purposes, and not prevent or disrupt public use/access to the park or its buildings. Affected: Foundation, park visitors, NPS. Enforced through agreement terms and agency oversight; no new criminal sanction
Sec. 3(c)(1)–(3) · Property Rights — Resource compatibility, protection, and public-access constraints apply to events; no new criminal sanction
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(c)(3) · Privacy and Due Process — Protects visitor access during events; no independent new hearing or appeal procedure
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(c)(1)–(3) · Government Power — Mandatory compatibility, resource-protection, and visitor-access safeguards
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(d)(1) · Economic Freedom — Secretary “shall charge” fee covering maintenance attributable to wear and tear from events. Affected: Foundation; fee obligation; no criminal penalty
Sec. 3(d)(2) · Economic Freedom — Secretary “may recover” all costs associated with Foundation event use, “notwithstanding any other provision of law,” including maintenance, utilities, administration, security, and personnel. Affected: Foundation and federal fisc; cost recovery, no new tax or criminal sanction
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(d)(1)–(2) · Government Power — Mandatory wear-and-tear fee and discretionary broad cost recovery, including notwithstanding-other-law clause
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(d)(1) · Economic Freedom — Secretary “shall charge” fee covering maintenance attributable to wear and tear from events. Affected: Foundation; fee obligation; no criminal penalty
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(d)(1)–(2) · Government Power — Mandatory wear-and-tear fee and discretionary broad cost recovery, including notwithstanding-other-law clause
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(d)(2) · Economic Freedom — Secretary “may recover” all costs associated with Foundation event use, “notwithstanding any other provision of law,” including maintenance, utilities, administration, security, and personnel. Affected: Foundation and federal fisc; cost recovery, no new tax or criminal sanction
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(d)(1)–(2) · Government Power — Mandatory wear-and-tear fee and discretionary broad cost recovery, including notwithstanding-other-law clause
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Sec. 3(e), Sec. 3(g) · Individual Rights — Preserves NPS event hosting and Secretary's authority to issue permits or enter other agreements. No direct general speech, religion, or assembly entitlement created
Sec. 3(f)(1)–(2) · Property Rights — Seven-year sunset of agreement authority and termination of agreement at seven years notwithstanding contrary agreement terms. No permanent property interest created
Sec. 3(e), Sec. 3(g) · Economic Freedom — Savings clauses preserve other NPS events, permits, and agreements; no general monopoly over all park events established
Sec. 3(h) · Privacy and Due Process — Four-year congressional report about operational effects (visitor access, security, staffing, facilities) and financial effects (fees and cost recovery). Institutional report, not individual-level personal-data mandate. No new penalty
Sec. 3(e), Sec. 3(g) · Government Power — Preserves Secretary/NPS preexisting special-event and permit authority
Sec. 3(f)(1)–(2) · Government Power — Seven-year expiration and agreement termination regardless of agreement terms
Sec. 3(h)(1)–(2) · Government Power — Secretary must report within four years of enactment to House Natural Resources and Senate Energy and Natural Resources committees on operations and finances. No new standalone penalty
Findings source: bill-scores-v2-batch5r-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.