Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
6 of 23 text blocks highlighted. Source: GovInfo, fetched cached.
[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 10988 Introduced in House (IH)]
<DOC>
119th CONGRESS
2d Session
H. R. 10988
To amend the Federal Power Act to direct the Federal Energy Regulatory
Commission to require that public utilities use advanced transmission
technologies when carrying out certain projects, and for other
purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
November 10, 2026
Mr. Vindman introduced the following bill; which was referred to the
Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To amend the Federal Power Act to direct the Federal Energy Regulatory
Commission to require that public utilities use advanced transmission
technologies when carrying out certain projects, and for other
purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
Sec. 1 — Short title
This Act may be cited as the ``Lower Electricity Bills Act''.
SEC. 2. ADVANCED TRANSMISSION TECHNOLOGIES.
Sec. 2(a) — new FPA 224(a): Defines advanced transmission technology, best-available conductor (capacity, efficiency, thermal-sag performance), covered FERC-jurisdictional projects
(a) In General.--Part II of the Federal Power Act (16 U.S.C. 824 et
seq.) is amended by adding at the end the following:
``SEC. 224. USE OF ADVANCED TRANSMISSION TECHNOLOGIES.
``(a) Definitions.--In this section:
``(1) Advanced transmission technology.--The term `advanced
transmission technology' has the meaning given the term in
section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C.
16422(a)).
``(2) Best-available transmission conductor.--The term
`best-available transmission conductor' means a transmission
conductor that, as determined by the Commission--
``(A) provides the greatest feasible and
commercially available energy-carrying capacity at a
given voltage level;
``(B) provides the highest feasible and
commercially available electrical efficiency at that
voltage level; and
``(C) provides the greatest available level of
mechanical performance, including mitigating thermal
sag at the maximum rated transmission-carrying capacity
of the applicable transmission facility.
``(3) Commission.--The term `Commission' means the Federal
Energy Regulatory Commission.
``(4) Covered project.--The term `covered project' means
the construction of a new transmission facility, or the
modification, upgrade, replacement, or reconductoring of an
existing transmission facility, subject to the jurisdiction of
the Commission under section 201(b).
``(b) Use of Advanced Transmission Technologies.--In exercising its
authority under sections 205 and 206, the Commission shall require that
public utilities use advanced transmission technologies, including
best-available transmission conductors, when carrying out covered
projects.
``(c) Presumption of Prudence for Advanced Transmission
Technologies.--In any filing seeking to recover the cost of an advanced
transmission technology for a covered project, and in any proceeding to
determine whether that cost may be recovered through rates, the
Commission shall presume that--
``(1) the use of an advanced transmission technology is a
prudent practice; and
``(2) the costs associated with the use of an advanced
transmission technology are just and reasonable.
``(d) Applicability.--The requirements of this section apply only
to public utilities and only with respect to covered projects.
``(1) In general.--Not later than 1 year after the date of
enactment of this section, the Commission shall issue an order
or rule to implement this section.
``(2) Requirements.--In issuing an order or rule under
paragraph (1), the Commission shall--
``(A) require that public utilities conduct, on
Commission-established timelines, recurring
evaluations--
``(i) to determine whether the benefits
associated with deploying advanced transmission
technologies through 1 or more covered
projects, including benefits to the current
transmission system of the applicable public
utility, outweigh the costs (such that the
applicable benefit-cost ratio is greater than
1);
``(ii) that include a least-cost analysis
with respect to the transmission system of the
applicable public utility; and
``(iii) that evaluate whether the costs for
which recovery is sought reflect due care to
minimize the total cost of the applicable
covered projects;
``(B) require public utilities to conduct, on
Commission-established timelines, recurring evaluations
to consider planning and construction timelines for new
transmission assets and risks and impacts of potential
delays;
``(C) require that, if the benefits of 1 or more
advanced transmission technologies outweigh the costs
(such that the applicable benefit-cost ratio is greater
than 1), the applicable public utility shall deploy the
advanced transmission technologies on a timeline
determined by the Commission;
``(D) require that decisions on whether to
implement advanced transmission technologies based on
the recurring evaluations under subparagraphs (A) and
(B) are reported to the Commission, in a manner
determined by the Commission;
``(E) in consultation with the Secretary of Energy,
establish a methodology for determining whether a
transmission conductor is a best-available transmission
conductor for purposes of this section;
``(F) ensure that the methodology established under
subparagraph (E) is consistent with the criteria
described in clauses (i) through (iii) of subparagraph
(A);
``(G) provide for periodic review and updating of
the methodology established under subparagraph (E) not
less frequently than annually to reflect improvements
in technology, materials, and system performance; and
``(H) determine a penalty for any public utility
that fails to deploy the relevant advanced transmission
technologies when the applicable benefit-cost ratio is
greater than 1 in a timeframe determined by the
Commission, including a reduction of the effective
return on equity for the transmission system of the
public utility.''.
Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition
(b) Definition of Advanced Transmission Technology.--Section
1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)) is
amended--
Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition
(1) in paragraph (18), by striking ``and'' at the end;
Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition
(2) by redesignating paragraph (19) as paragraph (23); and
Sec. 2(b) — adds dynamic line rating, power-flow control, topology optimization, high-performance conductors to technology definition
(3) by inserting after paragraph (18) the following:
``(19) dynamic line rating;
``(20) advanced power flow control;
``(21) transmission topology optimization;
``(22) high-performance conductors; and''.
<all>