Sponsor: Rep. Mace, Nancy [R-SC-1] · Latest action: Referred to the Committee on Energy and Commerce, and in addition to the Committees on Transportation and Infrastructure, and Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned. (2026-11-05)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 18 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 3(b)(1)(C) · Property Rights — Pilot prioritizes existing water/stormwater infrastructure; no new private-property entry or acquisition power See in text ↓
- Sec. 2(a)(2)(B)(v)–(vi) · Economic Freedom — EPA must assess cost, infrastructure, staffing, training and regulatory barriers See in text ↓
- Sec. 3(b)(1)(B)–(C) · Economic Freedom — Pilot evaluates cost/scalability and existing-facility deployability; no commercial mandate See in text ↓
- Sec. 4(1)–(2), (7) · Economic Freedom — Defines downstream capture and source-side materials-engineering approaches See in text ↓
- Sec. 2(b) · Privacy and Due Process — EPA reports to congressional committees within 180 days See in text ↓
- Sec. 3(b)(2) · Privacy and Due Process — Requires quantitative biodegradation, secondary-particle, ecotoxicity and recyclability metrics before pilot See in text ↓
- Sec. 3(e) · Privacy and Due Process — Final report within one year of termination See in text ↓
- Sec. 4(3)–(4), (6), (6)(8) · Privacy and Due Process — Defines microplastics, nanoplastics, standards and verified biodegradation. No individual-data or hearing rule See in text ↓
- Sec. 2(a)(1)–(2) · Government Power — EPA study of strategies, environmental performance, costs and risks See in text ↓
- Sec. 2(b) · Government Power — Report within 180 days See in text ↓
- Sec. 3(a) · Government Power — Pilot established within one year See in text ↓
- Sec. 3(b)(1)(A)(i)–(ii) · Government Power — At least three geographic regions, varied settings and proximity to NOAA/USGS where practicable See in text ↓
- Sec. 3(b)(1)(B)–(D) · Government Power — Evaluations and further-research criteria See in text ↓
- Sec. 3(b)(2) · Government Power — Success metrics See in text ↓
- Sec. 3(c)(1)–(2) · Government Power — NOAA, USGS and state coordination See in text ↓
- Sec. 3(d) · Government Power — Five-year pilot termination See in text ↓
- Sec. 3(e) · Government Power — Post-termination report See in text ↓
- Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation See in text ↓
Full text (introduced version)
25 of 27 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
SEC. 2. STUDY AND REPORT ON ANTI-MICROPLASTIC STRATEGIES.
Sec. 2(a)(2)(B)(v)–(vi) · Economic Freedom — EPA must assess cost, infrastructure, staffing, training and regulatory barriers
Sec. 2(a)(1)–(2) · Government Power — EPA study of strategies, environmental performance, costs and risks
Sec. 2(a)(1)–(2) · Government Power — EPA study of strategies, environmental performance, costs and risks
Sec. 2(a)(2)(B)(v)–(vi) · Economic Freedom — EPA must assess cost, infrastructure, staffing, training and regulatory barriers
Sec. 2(a)(1)–(2) · Government Power — EPA study of strategies, environmental performance, costs and risks
Sec. 2(b) · Privacy and Due Process — EPA reports to congressional committees within 180 days
Sec. 2(b) · Government Power — Report within 180 days
SEC. 3. PILOT PROGRAM TO DEMONSTRATE AND EVALUATE ANTI-MICROPLASTIC STRATEGIES.
Sec. 3(a) · Government Power — Pilot established within one year
Sec. 3(b)(1)(C) · Property Rights — Pilot prioritizes existing water/stormwater infrastructure; no new private-property entry or acquisition power
Sec. 3(b)(1)(B)–(C) · Economic Freedom — Pilot evaluates cost/scalability and existing-facility deployability; no commercial mandate
Sec. 3(b)(2) · Privacy and Due Process — Requires quantitative biodegradation, secondary-particle, ecotoxicity and recyclability metrics before pilot
Sec. 3(b)(1)(A)(i)–(ii) · Government Power — At least three geographic regions, varied settings and proximity to NOAA/USGS where practicable
Sec. 3(b)(1)(B)–(D) · Government Power — Evaluations and further-research criteria
Sec. 3(b)(2) · Government Power — Success metrics
Sec. 3(b)(1)(C) · Property Rights — Pilot prioritizes existing water/stormwater infrastructure; no new private-property entry or acquisition power
Sec. 3(b)(1)(B)–(C) · Economic Freedom — Pilot evaluates cost/scalability and existing-facility deployability; no commercial mandate
Sec. 3(b)(1)(A)(i)–(ii) · Government Power — At least three geographic regions, varied settings and proximity to NOAA/USGS where practicable
Sec. 3(b)(1)(B)–(D) · Government Power — Evaluations and further-research criteria
Sec. 3(b)(2) · Privacy and Due Process — Requires quantitative biodegradation, secondary-particle, ecotoxicity and recyclability metrics before pilot
Sec. 3(b)(2) · Government Power — Success metrics
Sec. 3(c)(1)–(2) · Government Power — NOAA, USGS and state coordination
Sec. 3(c)(1)–(2) · Government Power — NOAA, USGS and state coordination
Sec. 3(c)(1)–(2) · Government Power — NOAA, USGS and state coordination
Sec. 3(d) · Government Power — Five-year pilot termination
Sec. 3(e) · Privacy and Due Process — Final report within one year of termination
Sec. 3(e) · Government Power — Post-termination report
SEC. 4. DEFINITIONS.
Sec. 4(1)–(2), (7) · Economic Freedom — Defines downstream capture and source-side materials-engineering approaches
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(2), (7) · Economic Freedom — Defines downstream capture and source-side materials-engineering approaches
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(2), (7) · Economic Freedom — Defines downstream capture and source-side materials-engineering approaches
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(2), (7) · Economic Freedom — Defines downstream capture and source-side materials-engineering approaches
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(3)–(4), (6), (6)(8) · Privacy and Due Process — Defines microplastics, nanoplastics, standards and verified biodegradation. No individual-data or hearing rule
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(3)–(4), (6), (6)(8) · Privacy and Due Process — Defines microplastics, nanoplastics, standards and verified biodegradation. No individual-data or hearing rule
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(3)–(4), (6), (6)(8) · Privacy and Due Process — Defines microplastics, nanoplastics, standards and verified biodegradation. No individual-data or hearing rule
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(3)–(4), (6), (6)(8) · Privacy and Due Process — Defines microplastics, nanoplastics, standards and verified biodegradation. No individual-data or hearing rule
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Sec. 4(1)–(8) · Government Power — Definitions. No new penalty or fixed appropriation
Findings source: bill-scores-v2-batch24-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.