Findings — 12 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 2(b)(1), Sec. 2(b)(6) · Property Rights — Disclose significant ownership and proximity to protected property, but residential owners/addresses not identified See in text ↓
- Sec. 2(a) · Economic Freedom — Sponsors file 30 days before construction, 30 days after operation and by March 1 for next ten years; transition for existing facilities See in text ↓
- Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures See in text ↓
- Sec. 2(d) · Economic Freedom — Existing federal energy-report enforcement plus up to $1m per day civil penalties See in text ↓
- Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors See in text ↓
- Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete See in text ↓
- Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics See in text ↓
- Sec. 2(e) · Government Power — DOE rules within nine months; filing duties operate even before rules See in text ↓
- Sec. 2(f) · Government Power — Explicitly deny new facility approval authority See in text ↓
- Sec. 3 · Government Power — EIA database and reporting See in text ↓
- Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability See in text ↓
- Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily See in text ↓
Full text (introduced version)
75 of 76 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
SEC. 2. DISCLOSURE STATEMENT REQUIRED.
Sec. 2(a) · Economic Freedom — Sponsors file 30 days before construction, 30 days after operation and by March 1 for next ten years; transition for existing facilities
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(a) · Economic Freedom — Sponsors file 30 days before construction, 30 days after operation and by March 1 for next ten years; transition for existing facilities
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(a) · Economic Freedom — Sponsors file 30 days before construction, 30 days after operation and by March 1 for next ten years; transition for existing facilities
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1), Sec. 2(b)(6) · Property Rights — Disclose significant ownership and proximity to protected property, but residential owners/addresses not identified
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1), Sec. 2(b)(6) · Property Rights — Disclose significant ownership and proximity to protected property, but residential owners/addresses not identified
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1), Sec. 2(b)(6) · Property Rights — Disclose significant ownership and proximity to protected property, but residential owners/addresses not identified
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)(1)–(9) · Economic Freedom — Detailed ownership, utility, electric costs, rates, generation, water, protected areas, labor and government NDA disclosures
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(b)–(c) · Privacy and Due Process — Required commercial and ownership data made public within 15 days; confidentiality withholding makes filing incomplete
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(d) · Economic Freedom — Existing federal energy-report enforcement plus up to $1m per day civil penalties
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(d) · Economic Freedom — Existing federal energy-report enforcement plus up to $1m per day civil penalties
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(d) · Economic Freedom — Existing federal energy-report enforcement plus up to $1m per day civil penalties
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(e) · Government Power — DOE rules within nine months; filing duties operate even before rules
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(e) · Government Power — DOE rules within nine months; filing duties operate even before rules
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(e) · Government Power — DOE rules within nine months; filing duties operate even before rules
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(f) · Government Power — Explicitly deny new facility approval authority
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(f) · Government Power — Explicitly deny new facility approval authority
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 2(f) · Government Power — Explicitly deny new facility approval authority
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
SEC. 3. PUBLIC DATABASE.
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 3(a)–(d) · Privacy and Due Process — Free searchable/downloadable database without user registration and quarterly statistics
Sec. 3 · Government Power — EIA database and reporting
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
SEC. 4. DEFINITIONS.
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(4)–(12), (23) · Economic Freedom — Construction/operation timing, >=20 MW threshold, aggregation under common control, facility-load formula and jointly/severally liable sponsors
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Sec. 4(1)–(26) · Government Power — Technical definitions including protected areas, facility load, site and sponsor joint liability
Sec. 2–4 · Government Power — require extensive public disclosures by covered data-center sponsors, with joint liability and civil penalties up to $1 million daily
Findings source: bill-scores-v2-batch25-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.