Be A Freedom Fighter · Bill Library
HR 10860 — Stop Beijing's Bots Act
Freedom score: 0 (scale −10 to +10)
- Individual rights: 0
- Property rights: 0
- Economic freedom: -1
- Privacy & due process: 0
- Government power: +1
Sponsor: Rep. Biggs, Sheri [R-SC-3] · Latest action: Referred to the House Committee on Armed Services. (2026-10-22)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 13 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture See in text ↓
- Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services See in text ↓
- Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules See in text ↓
- Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine See in text ↓
- Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities See in text ↓
- Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan See in text ↓
- Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal See in text ↓
- Sec. 2(b) · Government Power — Prohibits sensitive-environment operation after two years See in text ↓
- Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight See in text ↓
- Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices See in text ↓
- Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control See in text ↓
- Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components See in text ↓
- Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset See in text ↓
Full text (introduced version)
18 of 19 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
SEC. 2. PROHIBITION ON PROCUREMENT AND OPERATION OF COVERED ROBOTIC SYSTEMS.
Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services
Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services
Sec. 2(a)(1)–(2) · Economic Freedom — After one year, DoD may not enter/renew procurement contracts for covered systems or incorporating products/services
Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture
Sec. 2(b) · Government Power — Prohibits sensitive-environment operation after two years
Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture
Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules
Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture
Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules
Sec. 2(b), (c)(1)–(2) · Property Rights — DoD operational/funding restrictions affect government-held systems, without private confiscation or forfeiture
Sec. 2(c)(1)–(2) · Economic Freedom — Prohibits DoD lease and operating spending on phased schedules
Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine
Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities
Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan
Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight
Sec. 2(d)(1)(A)–(F) · Economic Freedom — Secretary may grant renewable waivers up to 180 days based on alternatives, mission, costs, mitigation, connectivity and cybersecurity; waiver does not expressly cover separate spending prohibition. No new private fine
Sec. 2(d)(1)(D)–(F) · Privacy and Due Process — Waiver depends on cyber risk and separation from covered foreign entities
Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight
Sec. 2(d)(2)(A)–(D) · Privacy and Due Process — Congressional notice within 30 days with justification, mitigations and replacement plan
Sec. 2(d)(1)–(2) · Government Power — Conditional waivers and oversight
Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal
Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices
Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices
Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal
Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices
Sec. 2(e)(2)–(3) · Privacy and Due Process — Annual entity-list review and 30-day advance congressional notice; no express private appeal
Sec. 2(e)(1)–(3) · Government Power — Annual covered-system and Chinese-entity list reviews and notices
Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control
Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components
Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset
Sec. 2(f)(1)(A)–(C) · Government Power — Chinese entity definition includes domicile, at least 20% qualifying ownership or foreign control
Sec. 2(f)(2)(A)–(D) · Government Power — Covered quadrupedal robots, LiDAR, unmanned ground vehicles and determined components
Sec. 2(f)(3) · Government Power — Defines PLA robotics ecosystem. Procurement/funding timelines one to three years; no express sunset
Findings source: bill-scores-v2-batch30-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.