Be A Freedom Fighter · Bill Library

HR 10851 — Socket Full of Sunshine Act

Freedom score: -3 (scale −10 to +10)

Sponsor: Rep. Menendez, Robert [D-NJ-8] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-10-19)

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 23 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 2(a) · Individual Rights — proposed PURPA §111(d)(22): requires states to CONSIDER portable solar standards, not adopt them See in text ↓
  2. Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right See in text ↓
  3. Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity See in text ↓
  4. Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use See in text ↓
  5. Sec. 2(a) · Economic Freedom — PURPA §111(d)(22)(A): states consider exemptions from interconnection agreements and net metering and bans on utility prior approval, insurance, fees, or extra controls/equipment See in text ↓
  6. Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two See in text ↓
  7. Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions See in text ↓
  8. Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions See in text ↓
  9. Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000 See in text ↓
  10. Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold See in text ↓
  11. Sec. 3(g) · Economic Freedom — $100m authorized annually FY2027–2032, up to 10% admin/outreach; not guaranteed appropriation See in text ↓
  12. Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label See in text ↓
  13. Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification See in text ↓
  14. Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients See in text ↓
  15. Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime See in text ↓
  16. Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry See in text ↓
  17. Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption See in text ↓
  18. Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing See in text ↓
  19. Sec. 4 · Government Power — FTC voluntary label See in text ↓
  20. Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553 See in text ↓
  21. Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while See in text ↓
  22. Sec. 6(3)(F) · Government Power — uses >400 W See in text ↓
  23. Sec. 5 · Government Power — safety rule due within 60 days; no general sunset See in text ↓

Full text (introduced version)

49 of 57 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10851 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10851 To amend the Public Utility Regulatory Policies Act of 1978 to establish a Federal standard for States to consider measures to promote portable solar generation devices, and for other purposes. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES October 19, 2026 Mr. Menendez introduced the following bill; which was referred to the Committee on Energy and Commerce _______________________________________________________________________ A BILL To amend the Public Utility Regulatory Policies Act of 1978 to establish a Federal standard for States to consider measures to promote portable solar generation devices, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the ``Socket Full of Sunshine Act''.

SEC. 2. PORTABLE SOLAR GENERATION DEVICES.

Sec. 2(a) · Individual Rights — proposed PURPA §111(d)(22): requires states to CONSIDER portable solar standards, not adopt them

Sec. 2(a) · Economic Freedom — PURPA §111(d)(22)(A): states consider exemptions from interconnection agreements and net metering and bans on utility prior approval, insurance, fees, or extra controls/equipment

Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption

(a) Federal Standard.--Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
``(22) Portable solar generation devices.-- ``(A) Consideration.--Each State shall consider measures to promote the use of portable solar generation devices, particularly those manufactured in the United States, including by-- ``(i) exempting portable solar generation devices from-- ``(I) any requirement to obtain or execute an interconnection agreement prior to operating the portable solar generation device; and ``(II) net metering program requirements; and ``(ii) prohibiting electric utilities from requiring an electric consumer using a portable solar generation device to-- ``(I) obtain the electric utility's approval prior to installing or using the portable solar generation device; ``(II) purchase insurance for use of the portable solar generation device; ``(III) pay any fee or charge related to the portable solar generation device; or ``(IV) install any additional controls or equipment beyond what is integrated into the portable solar generation device. ``(B) Definition.--In this paragraph, the term `portable solar generation device' means a moveable photovoltaic generation device that-- ``(i) has a maximum power output of not more than 1,200 watts; ``(ii) is designed to be connected to a building's electrical system through a standard 120-volt alternating current outlet; ``(iii) is intended primarily to offset part of the electricity consumption of the electric consumer who owns or uses the device; ``(iv) meets the standards of the most recent version of the National Electrical Code; ``(v) is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory; and ``(vi) is equipped with a power control system, if the device has a maximum power output that is greater than or equal to 400 watts.''.

Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two

Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions

Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions

Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption

(b) Conforming Amendments.--

Sec. 2(b)(1),(b) · Economic Freedom — (2)(B),(c): conforming/date provisions

Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption

(1) Consideration and determination.--Section 111(a) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(a)) is amended by striking ``Each State'' and inserting ``Except as otherwise provided, each State''.

Sec. 2(b)(2)(A) · Economic Freedom — §112(b)(9): consideration begins/hearing set within one year and completes within two

Sec. 2(b)(2)(C) · Economic Freedom — §112(i): prior-action exceptions

Sec. 2(a)–(b) · Government Power — mandatory state consideration, not adoption

(2) Obligations to consider and determine.-- (A) Time limitations.--Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following: ``(9)(A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d).
``(B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d).''. (B) Failure to comply.--Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following: ``In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).''. (C) Prior state actions.--Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following:
``(i) Prior State Actions.--Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any State regulated electric utility in a State if, before the date of enactment of this subsection--
``(1) the State has implemented for the State regulated electric utility the standard (or a comparable standard);
``(2) the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the State regulated electric utility; or
``(3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the State regulated electric utility during the 3-year period ending on that date of enactment.''.
(c) Prior and Pending Proceedings.--Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following: ``In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).''.

SEC. 3. DOE GRANT PROGRAM.

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(a) Establishment.--The Secretary shall establish and carry out a program to award grants to States to establish and carry out a point- of-sale rebate program under which rebates shall be provided to assist low- or moderate-income households with the purchase of a portable solar generation device.

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(b) Application.--A State seeking a grant under the program established by the Secretary under subsection (a) shall submit to the Secretary an application that includes a plan to implement a point-of- sale rebate program described in subsection (a), including--

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(1) a plan to verify the income eligibility of households seeking a rebate for a portable solar generation device;

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(b)(1)–(2) · Privacy and Due Process — income eligibility verification for rebate recipients

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(2) a plan to allow rebates for portable solar generation devices at the point of sale in a manner that ensures that the income eligibility of a household seeking a rebate may be verified at the point of sale;

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(3) a plan to prioritize renters, multifamily residents, and high-energy burdened communities;

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(4) a plan to ensure that a household does not receive a rebate for the same portable solar generation device through both a point-of-sale rebate program described in subsection (a) and any other Federal grant or rebate program; and

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(5) any additional information that the Secretary may require.

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(c) Guidelines.--The Secretary shall prescribe guidelines for point-of-sale rebate programs described in subsection (a).

Sec. 3(a)–(d) · Economic Freedom — DOE state grants for point-of-sale rebates, income verification, renter/multifamily/high-burden priority, duplicate prevention, up to $1,000

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(d) Amount of Rebate.--The amount of a rebate provided under a point-of-sale rebate program described in subsection (a) for the purchase of a portable solar generation device shall be not more than $1,000.

Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(e) Buy America Requirements.--A rebate may be provided for a portable solar generation device under a point-of-sale rebate program described in subsection (a) only if the portable solar generation device--

Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(1) was manufactured in the United States; and

Sec. 3(e) · Economic Freedom — US-made and >55% domestic-component cost or applicable higher threshold

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(2) the cost of the components of the portable solar generation device that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the portable solar generation device, unless another standard for determining the minimum amount of domestic content of the portable solar generation device has been established under applicable law or regulation.

Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right

Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity

Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use

Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(f) Protection for Tenants.--

Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right

Sec. 3(f)(1) · Property Rights — grant-eligible states must prevent landlords from prohibiting qualifying tenant portable solar devices on/in leased premises, including balconies/patios where tenant pays electricity

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(1) In general.--A State may only receive a grant under this section if, subject to paragraph (2), the State prohibits landlords from prohibiting a tenant who is responsible for payment of the electric service used within the tenant's leased premises from-- (A) utilizing a portable solar generation device; or (B) placing a portable solar generation device on the exterior of, or within, the tenant's leased premises, including any leased balcony or patio.

Sec. 3(f) · Individual Rights — conditions state grant eligibility on tenant protections but does not impose an unconditional nationwide right

Sec. 3(f)(2)(A)–(B) · Property Rights — states may allow reasonable dimension/placement restrictions and notice/documentation. Limits landlord control, while enabling tenants’ use

Sec. 3(f)(2)(B) · Privacy and Due Process — states may require tenant notices/documentation. No independent data-retention or minimization regime

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(2) Reasonable restrictions.--A State receiving a grant under this section may-- (A) authorize a landlord to establish reasonable restrictions concerning the physical dimension, placement, or manner of placement of a portable solar generation device on the leased premises of the tenant's accessible exterior, including the balcony, patio, and exterior wall surfaces; or (B) require a tenant to provide written notice and other documentation the State determines appropriate to the landlord or any other person the State determines necessary, regarding the tenant's intended use of a portable solar generation device.

Sec. 3(g) · Economic Freedom — $100m authorized annually FY2027–2032, up to 10% admin/outreach; not guaranteed appropriation

Sec. 3(a)–(g) · Government Power — DOE grant administration, state landlord-law eligibility condition, domestic sourcing

(g) Authorization of Appropriations.--There is authorized to be appropriated $100,000,000 for each of fiscal years 2027 through 2032 to carry out this section, of which not more than 10 percent may be used for administrative and outreach purposes.

SEC. 4. EXPECTED ELECTRICITY COSTS SAVINGS LABEL.

Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label

Sec. 4 · Government Power — FTC voluntary label

The Federal Trade Commission, in consultation with the Administrator of the Environmental Protection Agency and the Secretary, shall establish a label, to be used voluntarily, for portable solar generation devices that--

Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label

Sec. 4 · Government Power — FTC voluntary label

(1) identifies the expected savings in costs of electricity for the electric consumer using the portable solar generation device; and

Sec. 4 · Economic Freedom — FTC voluntary electricity-savings label

Sec. 4 · Government Power — FTC voluntary label

(2) is similar in appearance to an Energy Guide label.

SEC. 5. CONSUMER PRODUCT SAFETY STANDARD FOR PORTABLE SOLAR GENERATION DEVICES.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(a) In General.--Not later than 60 days after the date of the enactment of this Act, the Consumer Product Safety Commission shall promulgate, under section 553 of title 5, United States Code, a final consumer product safety standard for portable solar generation devices that ensures that portable solar generation devices are safe to use at home, including by requiring that any such portable solar generation device include information (through a pamphlet or through any other form as the Consumer Product Safety Commission determines appropriate) on the following:

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(1) How to use the portable solar generation device at home in a safe manner.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(2) How to install the portable solar generation device.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(3) Any expected savings from the portable solar generation device.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(4) Any warranties with respect to the portable solar generation device.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(5) Any other information related to the safety of the portable solar generation device as the Consumer Product Safety Commission determines appropriate.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(b) Consultation.--In promulgating the standard under subsection (a), the Consumer Product Safety Commission shall consult with the following:

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(1) The Department of Energy.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(2) The Environmental Protection Agency.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(3) Labor organizations.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(4) UL Solutions.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(5) Solar industry associations.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(b) · Privacy and Due Process — requires consultations, including labor organizations, UL Solutions, and industry

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(6) Any other relevant group as the Consumer Product Safety Commission determines appropriate.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(c) Modifications.--At any time after the promulgation of the standard under subsection (a), the Consumer Product Safety Commission may, through a rulemaking under section 553 of title 5, United States Code, modify the requirements of the standard.

Sec. 5(a)–(d) · Economic Freedom — mandatory CPSC consumer safety rule within 60 days, consultation and APA modification

Sec. 5(a)–(d) · Government Power — mandatory CPSC safety standard treated as CPSA §9 rule and later modifications under 5 U.S.C. §553

Sec. 5 · Government Power — safety rule due within 60 days; no general sunset

(d) Treatment of Standard.--A standard promulgated under subsection (a), including a modification of such standard, shall be treated as a consumer product safety rule promulgated under section 9 of the Consumer Product Safety Act (15 U.S.C. 2058).

SEC. 6. DEFINITIONS.

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

In this Act:

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(1) Electric consumer.--The term ``electric consumer'' has the meaning given such term in section 3 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2602).

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(2) Low- or moderate-income household.--The term ``low- or moderate-income household'' has the meaning given such term in section 50122 of Public Law 117-169 (42 U.S.C. 18795a).

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

Sec. 6(3)(F) · Government Power — uses >400 W

(3) Portable solar generation device.--The term ``portable solar generation device'' means a moveable photovoltaic generation device that--

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(A) has a maximum power output of not more than 1,200 watts;

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(B) is designed to be connected to a building's electrical system through a standard 120-volt alternating current outlet;

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(C) is intended primarily to offset part of the electricity consumption of the electric consumer who owns or uses the device;

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(D) meets the standards of the most recent version of the National Electrical Code;

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(E) is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory; and

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

Sec. 6(3)(F) · Government Power — uses >400 W

(F) is equipped with a power control system, if the device has a maximum power output that is greater than 400 watts.

Sec. 6 · Government Power — defines device and income terms. Note discrepancy: proposed PURPA §111(d)(22)(B) uses power control at >=400 W, while

(4) Secretary.--The term ``Secretary'' means the Secretary of Energy. <all>

Findings source: bill-scores-v2-batch35-findings-2026-11-14.md. Highlights come only from that file; no finding, score, or provision was invented for this page.

What you can do

Contact your U.S. Representative and Senators about this bill.

Find your Representative Contact your Senators

Spot an error on this page? Report it.