Be A Freedom Fighter · Bill Library
HR 10738 — Affordable Power for Host Communities Act
Freedom score: -1 (scale −10 to +10)
- Individual rights: 0
- Property rights: 0
- Economic freedom: 0
- Privacy & due process: 0
- Government power: -1
Sponsor: Rep. Gallagher, James [R-CA-1] · Latest action: Referred to the House Committee on Energy and Commerce. (2026-10-05)
Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index
Findings — 4 highlighted provisions
Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.
- Sec. 1 — Short title. Names host-community electricity measure See in text ↓
- Sec. 2(a) — PURPA §111(d)(22). Adds proposed rate standard: covered host-county electric customers would receive a 20% discount relative to same class outside the host county. “Host county” includes specified generating sites ≥5 MW meeting burden criteria; definition lists hydro, geothermal, biomass, solar, wind and associated infrastructure See in text ↓
- Sec. 2(b)(1)–(2) · Government Power — Consideration deadlines. State regulatory bodies and nonregulated utilities must start considering or set a hearing within one year and decide within two years; this does not require that they actually adopt the rate standard See in text ↓
- Sec. 2(b)(3) · Government Power — and §2(c), Exceptions/cross references. Special treatment for previous state consideration and ongoing ratemaking proceedings; the scheme works through PURPA consideration duties, not immediate self-executing utility bills See in text ↓
Full text (introduced version)
6 of 13 text blocks highlighted. Source: GovInfo, fetched cached.
SECTION 1. SHORT TITLE.
Sec. 1 — Short title. Names host-community electricity measure
SEC. 2. DISCOUNTED RATES FOR HOST COUNTIES.
Sec. 2(a) — PURPA §111(d)(22). Adds proposed rate standard: covered host-county electric customers would receive a 20% discount relative to same class outside the host county. “Host county” includes specified generating sites ≥5 MW meeting burden criteria; definition lists hydro, geothermal, biomass, solar, wind and associated infrastructure
Sec. 2(b)(1)–(2) · Government Power — Consideration deadlines. State regulatory bodies and nonregulated utilities must start considering or set a hearing within one year and decide within two years; this does not require that they actually adopt the rate standard
Sec. 2(b)(3) · Government Power — and §2(c), Exceptions/cross references. Special treatment for previous state consideration and ongoing ratemaking proceedings; the scheme works through PURPA consideration duties, not immediate self-executing utility bills
Sec. 2(b)(1)–(2) · Government Power — Consideration deadlines. State regulatory bodies and nonregulated utilities must start considering or set a hearing within one year and decide within two years; this does not require that they actually adopt the rate standard
Sec. 2(b)(1)–(2) · Government Power — Consideration deadlines. State regulatory bodies and nonregulated utilities must start considering or set a hearing within one year and decide within two years; this does not require that they actually adopt the rate standard
Sec. 2(b)(3) · Government Power — and §2(c), Exceptions/cross references. Special treatment for previous state consideration and ongoing ratemaking proceedings; the scheme works through PURPA consideration duties, not immediate self-executing utility bills
Findings source: bill-scores-v2-batch47-findings-2026-11-15.md. Highlights come only from that file; no finding, score, or provision was invented for this page.
What you can do
Contact your U.S. Representative and Senators about this bill.
Find your Representative Contact your Senators
Spot an error on this page? Report it.