HR 10687 — Utility Affordability and Transparency Act

Freedom score: +2 (scale −10 to +10)

Sponsor: · Latest action: ()

Full text on GovInfo (introduced version) · Congress.gov · ← Bill Library index

Findings — 14 highlighted provisions

Each item below is one provision documented in the findings file. The same provision is highlighted in the full text underneath, with its section citation and criterion. Everything else on this page is plain, unreviewed bill text.

  1. Sec. 2(1)–(4) · Individual Rights — Adjusts electricity-emergency administration and utility/customer notice; does not restrict individual speech or noncommercial bodily liberty See in text ↓
  2. Sec. 2(4), new Federal Power Act §202(c)(7)(A)–(B) · Property Rights — The intended scope is forced operation of retired or closing facilities, but the ACTUAL prohibition says the "Commission may not issue an order" while amended paragraphs (1), (2), and (4) refer to the "Secretary" as the emergency order issuer. On a literal reading the new ban may fail to bind the Secretary. It is not safely treated as an effective new plant-owner right to retire See in text ↓
  3. Sec. 2(1)(E), Sec. 2(1)(2)(B) · Economic Freedom — The Secretary must justify an emergency order and specify necessary operating hours for orders of 96 hours or less, or methodology for longer orders See in text ↓
  4. Sec. 2(3)(C) · Economic Freedom — Before renewal/reissuance the Secretary must study lower-net-cost alternatives See in text ↓
  5. Sec. 2(4), new §202(c)(6)(B) · Economic Freedom — Utilities affected by orders must send written customer estimates/cost descriptions within 60 days, a disclosure burden See in text ↓
  6. Sec. 2(4), new §202(c)(7) · Economic Freedom — The stated electricity-plant forced-retirement limitation is textually addressed to the Commission, apparently not the designated Secretary; exception requires no alternative emergency remedy and written transmission-organization request to the Secretary. Application to Secretary is uncertain rather than assumed See in text ↓
  7. Sec. 2(3)(D) · Privacy and Due Process — A petition for judicial review of renewed/reissued paragraph (4) orders may proceed under §313(b) without a §313(a) rehearing petition See in text ↓
  8. Sec. 2(1)(E), Sec. 2(1)(2)(B), (3)(C)–(D) · Privacy and Due Process — Written rationales and alternatives analyses supply administrative transparency; no new private-person data collection See in text ↓
  9. Sec. 2(1)(A)–(D), (F), (F)(2)(A), (F)(3)(A) · Government Power — Reassigns emergency-order wording in FPA §202(c) to the Energy Secretary, reserving Commission terminology for relevant functions See in text ↓
  10. Sec. 2(3)(B)–(C) · Government Power — Moves environmental-law-conflict wording within the renewal provisions and requires identification of the consulted federal agency See in text ↓
  11. Sec. 2(4), new §202(c)(6)(A) · Government Power — FERC must publish an emergency-order report within 30 days detailing alternatives, causes, expected utility/customer costs and other impacts See in text ↓
  12. New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days See in text ↓
  13. New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated See in text ↓
  14. Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application See in text ↓

Full text (introduced version)

19 of 20 text blocks highlighted. Source: GovInfo, fetched cached.

[Congressional Bills 119th Congress] [From the U.S. Government Publishing Office] [H.R. 10687 Introduced in House (IH)] <DOC> 119th CONGRESS 2d Session H. R. 10687 To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders that prevent or delay the retirement of power plants. _______________________________________________________________________ IN THE HOUSE OF REPRESENTATIVES October 1, 2026 Mr. Mrvan introduced the following bill; which was referred to the Committee on Energy and Commerce _______________________________________________________________________ A BILL To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders that prevent or delay the retirement of power plants. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

This Act may be cited as the ``Utility Affordability and Transparency Act''.

SEC. 2. MODIFICATIONS TO EMERGENCY AUTHORITY UNDER THE FEDERAL POWER ACT.

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

Section 202(c) of the Federal Power Act (16 U.S.C. 824a(c)) is amended--

Sec. 2(1)–(4) · Individual Rights — Adjusts electricity-emergency administration and utility/customer notice; does not restrict individual speech or noncommercial bodily liberty

Sec. 2(1)(E), Sec. 2(1)(2)(B) · Economic Freedom — The Secretary must justify an emergency order and specify necessary operating hours for orders of 96 hours or less, or methodology for longer orders

Sec. 2(1)(E), Sec. 2(1)(2)(B), (3)(C)–(D) · Privacy and Due Process — Written rationales and alternatives analyses supply administrative transparency; no new private-person data collection

Sec. 2(1)(A)–(D), (F), (F)(2)(A), (F)(3)(A) · Government Power — Reassigns emergency-order wording in FPA §202(c) to the Energy Secretary, reserving Commission terminology for relevant functions

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

(1) in paragraph (1)-- (A) by striking ``Commission'' after ``During the continuance of any war in which the United States is engaged, or whenever the'' and inserting ``Secretary of Energy (referred to in this subsection as the `Secretary')''; (B) by striking ``or other causes, the Commission'' and inserting ``the Secretary''; (C) by striking ``its own motion'' and inserting ``the Secretary's motion''; (D) by striking ``its judgment'' and inserting ``the Secretary's judgment''; (E) by inserting ``As part of the order, the Secretary shall explain why such order, including the requirements under such order, will best meet the emergency and serve the public interest.'' after ``serve the public interest.''; and (F) by striking ``Commission'' after ``carrying out such order, the'' and inserting ``Federal Energy Regulatory Commission (referred to in this subsection as the `Commission')'';

Sec. 2(1)–(4) · Individual Rights — Adjusts electricity-emergency administration and utility/customer notice; does not restrict individual speech or noncommercial bodily liberty

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

(2) in paragraph (2)-- (A) by striking ``Commission'' after ``law or regulation, the'' and inserting ``Secretary''; and (B) by adding at the end the following: ``The Secretary shall state in each such order--

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(A) that is in effect for 96 or fewer hours, the specific hours that are necessary to meet the emergency and serve the public interest; or

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(B) that is in effect for more than 96 hours, the specific methodology by which such hours that are necessary to meet the emergency and serve the public interest were determined.'';

Sec. 2(1)–(4) · Individual Rights — Adjusts electricity-emergency administration and utility/customer notice; does not restrict individual speech or noncommercial bodily liberty

Sec. 2(3)(C) · Economic Freedom — Before renewal/reissuance the Secretary must study lower-net-cost alternatives

Sec. 2(3)(D) · Privacy and Due Process — A petition for judicial review of renewed/reissued paragraph (4) orders may proceed under §313(b) without a §313(a) rehearing petition

Sec. 2(3)(B)–(C) · Government Power — Moves environmental-law-conflict wording within the renewal provisions and requires identification of the consulted federal agency

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

(3) in paragraph (4)-- (A) by striking ``Commission'' each place it appears and inserting ``Secretary''; (B) in subparagraph (A), by striking ``that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation''; (C) in subparagraph (B)-- (i) by inserting ``that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation'' after ``In renewing or reissuing an order under subparagraph (A)''; and (ii) by inserting ``The Secretary shall publicly identify the primary Federal agency consulted.'' after ``practicable.''; and (D) by adding at the end the following:

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(C) Before renewing or reissuing an order under subparagraph (A), the Secretary shall undertake a robust study of available alternatives that would reduce the net costs as compared to renewing or reissuing the order.

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(D) In the event the Secretary issues a renewed or reissued order under this paragraph, a petition for judicial review of such renewed or reissued order may be filed under section 313(b) without filing a request for rehearing or otherwise complying with any requirements of section 313(a).''; and

Sec. 2(1)–(4) · Individual Rights — Adjusts electricity-emergency administration and utility/customer notice; does not restrict individual speech or noncommercial bodily liberty

Sec. 2(4), new Federal Power Act §202(c)(7)(A)–(B) · Property Rights — The intended scope is forced operation of retired or closing facilities, but the ACTUAL prohibition says the "Commission may not issue an order" while amended paragraphs (1), (2), and (4) refer to the "Secretary" as the emergency order issuer. On a literal reading the new ban may fail to bind the Secretary. It is not safely treated as an effective new plant-owner right to retire

Sec. 2(4), new §202(c)(6)(B) · Economic Freedom — Utilities affected by orders must send written customer estimates/cost descriptions within 60 days, a disclosure burden

Sec. 2(4), new §202(c)(7) · Economic Freedom — The stated electricity-plant forced-retirement limitation is textually addressed to the Commission, apparently not the designated Secretary; exception requires no alternative emergency remedy and written transmission-organization request to the Secretary. Application to Secretary is uncertain rather than assumed

Sec. 2(4), new §202(c)(6)(A) · Government Power — FERC must publish an emergency-order report within 30 days detailing alternatives, causes, expected utility/customer costs and other impacts

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

(4) by adding at the end the following: ``(6)(A) Not later than 30 days after the date on which the Secretary issues an order under this subsection (including any renewal or reissuance of an order under this subsection), the Commission shall publish, including on a publicly accessible website, a report on--

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(i) the results of the study of alternatives under paragraph (4), if applicable;

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(ii) the causes of the applicable emergency;

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(iii) estimates of the costs that are expected to be incurred by any electric utility and customers of such electric utility as a result of the order; and

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(iv) other expected impacts of the order.

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(B) Not later than 60 days after the date on which the Secretary issues an order under this subsection (including any renewal or reissuance of an order under this subsection), an electric utility that has been, or is expected to be, affected as a result of the order, including any electric utility described in subparagraph (A)(iii), shall provide in writing to customers of the electric utility a description of the costs incurred due to the order, or costs expected to be incurred as a result of the order, including any information relevant to the electric utility and the customers of the electric utility published in the applicable report under subparagraph (A). ``(7)(A) Except as provided in subparagraph (B), the Commission may not issue an order under this subsection (including any renewal or reissuance of an order under this subsection) that would--

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(i) prevent or delay the retirement or other permanent closure of a facility for the generation of electric energy; or

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(ii) require the generation of electric energy at a facility that has retired or otherwise permanently closed.

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(B) Subparagraph (A) shall not apply to a particular facility if--

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(i) an emergency exists that cannot be met in any manner other than the delay of the retirement or other permanent closure of the facility; and

New §202(c)(6)(B) · Government Power — Affected utilities must notify customers within 60 days

New §202(c)(7) · Government Power — Contains the Commission/Secretary actor mismatch noted above. No new criminal sanction or appropriations are stated

Sec. 2 · Government Power — changes the ordering officer to the "Secretary." Literal reading could make the prohibition ineffective against the Secretary. Do not silently repair the bill. Section §313 judicial review/rehearing and existing §202(c) context control precise application

``(ii) the applicable Transmission Organization requests in writing to the Secretary to delay the retirement or other permanent closure of the facility.''. <all>

Findings source: bill-scores-v2-batch54-findings-2026-11-15.md. Highlights come only from that file; no finding, score, or provision was invented for this page.